I should have posted a follow-up to my 2009 resolutions yesterday. But I guess today is as good as ever! Last year, I posted a very
loooooong list of things to do around the house. But we'll get to that in a second. Let's first talk this year's resolutions:
- Finish 2009's list
- Blog once a week!
I used to love it then it began to feel like a chore. I made a concentrated effort to stop spending so much time online. It was nice! But I do miss updating with projects and I'm very behind on my Google reader. Like 2000 blog posts to read! lol
Ok, so let's see how well I did with the 2009 list, considering I pretty much did NOTHING to the house in the last few months.
Living Room/Dining Room1.
Replace all outdated electric outlets2.
Hide the cords in the entertainment center3.
Paint the baseboard4.
Replace damaged floor boards5. Attach quarter round
6.
Replacement blinds for backdoor7.
Decorate entertainment center8. Rug to help anchor the space
9.
Organize entryway closets (one for hanging items, one with shelves and baskets)10. Paint interior of entryway closets
(Um... one down, one to go)11. Finish painting exterior of built-in
12. Prime and paint interior of built-in (and start using it to store things!)
* Wish list: flat panel TV
(come February!),
new couch and chair, more grown-up coffee tableKitchen1. Replace GFI outlets with matching ones that I bought a year ago
2.
Replace damaged floor boards3. Attach baseboards and quarter round
4. Replace ugly fluorescent light above sink to something more modern
5. Hook up the garbage disposal that was installed nearly 18 months ago
6.
Start planning for new Ikea kitchen cabinets and countertops in 2010 Now I just need the funds! lolLaundry Room/Mud Room1. Prepare walls for painting (sanding area where cabinets were removed)
2. Paint ceiling
3. Paint walls (same color as living room)
4. Install tile
Halfway there!
5. Organize space for shoes, coats, hats, etc.
Hallway1.
Replace outdated eletrical outlets2.
Repaint with satin finish3.
Paint baseboards4.
Hang picturesMaster Bedroom1.
Replace all outdated electric outlets2.
Repaint3.
Purchase comforter and duvet cover for new bed4.
Install closet organizer (already purchased) Decided against this idea5.
Purchase matching lamps for nightstands6. Paint doors and baseboards
2nd Bedroom1. Replace all outdated electric outlets and light switch
2.
Install new carpet3.
Remove 50% of items and give to Goodwill Hah! Removed close to 90% of the items!4. Install shelves (already purchased)
What the heck was I even talking about here??5. Paint doors and baseboards
6. Prime and paint interior of closet
7.
Find a better way to hide litter box* Wish list: Bed for guests (Hmm, guess I'd have to move the litter box then!)
3rd Bedroom (a.k.a. Man Room)1. Decor for walls
2. Paint baseboards and doors
3. Give 75% of stored items in closet to Goodwill
4. Paint interior of closet
Bathroom1. Finish flooring in linen closet
2.
Paint walls3.
Recaulk tub Hallelujah! Silicone caulk is the guaranteed way to go. Even the bathroom-designated latex caulk isn't worth it. Silicone is a little messier but WAY better.4.
Replace toilet Wasn't on the 2009 list but was on the Ultimate list. The leaking toilet just forced us to do it this last year. And I love it! Well, as much as you can love a toilet.Exterior1.
Plant grass in bare spots2.
Add additional ornamental grass to front yard3. Plant ground cover on side of house Changed this to hosta and halfway done!
4.
Finish weeding and mulching retaining wall5. Clear overgrown weeds from back fence
LOLOLOLOL No longer on the list. It was just groundcover but I'll PAY to have someone do this.6.
Dispose of the ginormous tub of river rock7.
Paint exterior of workshop8. Scrape and paint all trim
9. Replace both water spickets
One down, one to go!Whew! I got a lot done but I feel like I failed because there's still so much to do. (I know I'm just too hard on myself!) But the house improvements are never ending anyway, right?? :) I hope everyone had a great holiday and you'll be hearing from me soon!