Here's where things stand so far:
(Many pics to come!)
Living Room/Dining Room
1.
2.
3.
4.
5. Attach quarter round almost there
6.
7.
8. Rug to help anchor the space
9.
10. Paint interior of entryway closets
11. Finish painting exterior of built-in
12. Prime and paint interior of built-in (and start using it to store things!)
* Wish list: flat panel TV, new couch and chair, more grown-up coffee table
Kitchen
1. Replace GFI outlets with matching ones that I bought a year ago
2.
3. Attach baseboards and quarter round
4. Replace ugly fluorescent light above sink to something more modern
5. Hook up the garbage disposal that was installed nearly 18 months ago
6.
Laundry Room/Mud Room
1. Prepare walls for painting (sanding area where cabinets were removed)
2. Paint ceiling
3. Paint walls (same color as living room)
4. Install tile 50% there
5.
Hallway
1.
2.
3.
4.
Master Bedroom
1.
2.
3.
4. Install closet organizer (already purchased)
5.
6. Paint doors and baseboards
2nd Bedroom
1. Replace all outdated electric outlets and
2.
3.
4. Install shelves (already purchased)
5. Paint doors and baseboards
6. Prime and paint interior of closet
7. Find a better way to hide litter box
* Wish list: Bed for guests (Hmm, guess I'd have to move the litter box then!)
3rd Bedroom (a.k.a. Man Room)
1. Decor for walls
2. Paint baseboards and doors
3.
4. Paint interior of closet
Bathroom
1. Finish flooring in linen closet
2.
3.
Exterior
1.
2.
3. Plant ground cover on side of house 50% there, but planting hosta instead
4. Finish weeding and mulching retaining wall
5. Clear overgrown weeds from back fence
6.
7. Paint exterior of workshop 50% there
8. Scrape and paint all trim
9. Replace both water spickets 50% there
Yowzers. I can't believe I've gotten all of that done! Of course, I could have done it without my sidekick: coffee. Eh, and maybe Matt. :)
2 comments:
I am seriously impressed with all your progress!
You have done a crazy-lot. If you ain't pattin' yourself on the back... I'll do it for ya.
Post a Comment